Customization: | Available |
---|---|
After-sales Service: | Support |
Warranty: | 12 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Plastic Injection mould cooling 150 tons water cooled industrial chiller
5. Package
6. Water cooled Chiller pictures
Mgreebelt chiller got CE, UL, SABER, CA certificate to different market.
7. MGREENBELT factory production lines
8. Water cooled chiller parameter
Product | Water Cooled Screw Chiller | ||||
Model | MG-550WS | MG-400WS | |||
Power supply | 3phase-480v-60hz | 3phase-480v-60hz | |||
Temperature control range | 5ºC~30ºC | 5ºC~30ºC | |||
Cooling capacity | tons | 150 | 120 | ||
kW | 530 | 425 | |||
KCal/hr | 455800 | 365500 | |||
Refrigerant | Type | R407c | R407c | ||
Control type | Expansion valve | Expansion valve | |||
Compressor | Type | Semi-hermetic screw | Semi-hermetic screw | ||
Quantity | 1 | 1 | |||
Start method | Y-△ | Y-△ | |||
Energy control stage | 25-50-75-100% | 25-50-75-100% | |||
Power | kW | 106.2 | 88.6 | ||
Evaporator | Type | Shell and Tube | Shell and Tube | ||
Chilled water flow | m3/h | 90.9 | 73.8 | ||
Inlet/outlet pipe dia. | DN125 | DN125 | |||
Condenser | Type | Shell and tube | Shell and Tube | ||
Cooling water flow | m3/h | 117.6 | 101.6 | ||
Inlet/outlet pipe dia. | DN125 | DN125 | |||
Dimension | L*W*H | mm | 3600*1450*2000 | 3400*1350*2000 | |
N.W | kg | 3000 | 2600 | ||
Protection system | High/Low Pressure protection , Phase-sequencing Protection, Overload Protection, Overheat Protection, Water flow protection, Anti-frozen protection, Exhaust overheat protection, Compressor oil level protection, |
FAQ
1. Are you manufacturer or Trade Company?
We are OEM professional factory, founded in 2003.
2. What's the order process?
.Inquiry---provide us all clear requirements.
.Quotation---quotation form with all clear specifications.
.Contract confirmation---provide correct contract details.
.Payment terms--- T/T 30% in advanced, balanced before shipment.
.Production---mass production
.Testing: 8hours, to ensure the quality of the machine
.Shipping--- by sea, train, air or courier. Detailed picture of package will be provided.
.Installation
3.What terms of payment you use?
T/T, L/C,etc.
4. How to get a prompt quotation?
When you send the inquiry to us, pls kindly send it with below technical information.
1)water chiller type: Air cooled or water cooled
2)Cooling capacity: _____ Kcal/hr or _____KW
3)Refrigerant: R22 or others
4) Voltages and Frequency : ______V/PH/HZ
5) Application industry:
Please provide the information above, so we can supply best water cooling solutions.